Family-owned paving & masonry contractor serving New Jersey for 30+ years · Licensed & insured
Serving Long Valley & Morris County
Asphalt, pavers and concrete for driveways, patios, walkways and parking areas in Long Valley, NJ, built on a properly compacted base.
Three decades paving NJ properties
Fully licensed NJ contractor
Owner-led, hands-on projects
Written, no-obligation quotes
Long Valley, NJ
Quick answer
Looking for paving contractors in Long Valley, NJ? Old Irish Paving & Masonry is a family-owned, licensed and insured contractor with 30+ years of experience. We give written, itemised quotes that spell out excavation, base depth and asphalt thickness, and our own crew does the work.
Long Valley homes sit on large lots, many on Schooley’s Mountain, with long, steep driveways, well water and septic systems. Whatever you’re paving in Long Valley, the result depends on what’s underneath: excavation to stable ground, a compacted stone base, and drainage that moves water away from your home.
Steep grades, rock ledge and heavy runoff, especially on Schooley’s Mountain, demand strong bases, crowned surfaces and proper drainage.
Key facts
Problems we solve
These are the issues we’re called about most in Long Valley and nearby Morris County: some are specific to local soils, terrain and housing, others are common across New Jersey.
What you seeWashed-out edges, slick winter surfaces and runoff damage.
Why it happensSteep grades and heavy runoff.
How we fix itHeavier base, crowned surfaces, swales, culverts and Belgian block edges.
How to prevent itClear drainage each season.
What you seeLedge and large stones when digging.
Why it happensRocky glacial terrain.
How we fix itProper equipment and design adjustments, priced transparently.
How to prevent itExpect it and plan for it.
What you seeErosion and unusable slopes.
Why it happensHillside lots.
How we fix itRetaining walls and terraced patios with drainage.
How to prevent itKeep downspouts away from walls.
What you seeThe sides of the driveway are breaking off into the lawn, especially where cars drive close to the edge.
Why it happensAsphalt edges with no support underneath, or with base that stops short of the edge, crack under tire loads. Lawn sprinklers and runoff wash out the soil beside them.
How we fix itWe cut back to solid asphalt, extend and compact the base beyond the paved edge, repave, and often install Belgian block curbing to lock the edge in place.
How to prevent itBuild the base wider than the asphalt, tamp the edges at a bevel, and keep heavy vehicles off the outer foot of the driveway.
What you seeChunks of asphalt are pushed onto the lawn every winter, and the edges get rougher each year.
Why it happensUnsupported asphalt edges, and plow blades set too low.
How we fix itWe rebuild the edges on a wider base and install Belgian block curbing as a solid, plow-resistant border.
How to prevent itMark the edges with stakes before winter and ask your plow service to use a shoe or rubber edge.
What you seeSections of pavers have lifted, often near the house or where water collects.
Why it happensWater in a poorly draining base freezing and expanding. Frost-susceptible soils make it worse.
How we fix itWe rebuild the base with free-draining stone, correct the pitch and address the water source (downspouts, grading).
How to prevent itProper base material and drainage prevent heaving. This is the most important detail on any paver job.
Avoid door-to-door “leftover asphalt” offers. See how to choose an asphalt contractor.
Our process
Tom or a family member walks the property, measures, checks drainage and talks through materials and budget.
You get a clear, itemised quote covering excavation, base depth, materials, finish and clean-up. No pressure.
Our own crew excavates, builds the compacted base and installs the surface using quality materials.
We clean up, walk the finished job with you, explain aftercare and stand behind the work.
Steep Long Valley driveways need asphalt that’s compacted well on grades and drainage that stops water from running down the drive. We add swales, culverts and Belgian block where needed.
Long Valley asphalt projects are often long private drives and lanes that need careful grading and thicker sections.
Every Long Valley quote lists the excavation depth, base depth and finished thickness in writing so you can compare contractors fairly.
| Surface | Why choose it | Upkeep |
|---|---|---|
| Asphalt / blacktop | Best value; handles plowing and salt | Sealcoat every 2–3 years |
| Interlocking pavers | Premium curb appeal; easy repairs | Re-sand joints occasionally |
| Concrete | Clean, bright, long-lasting | Seal periodically; avoid harsh de-icers |
| Bluestone / natural stone | Classic look for patios and walks | Repoint or reset occasionally |
Farms, shops and businesses in Long Valley rely on us for parking areas and access drives. For homeowners, see residential paving, and for businesses see commercial paving.
Plan with confidence
Reviews
★★★★★
Last month they did my backyard stoop, patio and walkway, and added a french drain to a sump pit in the yard. They did an amazing job! I highly recommend them for any paving and masonry work. Tom and crew are a pleasure to deal with.
— Bill P., Google review
★★★★★
Tom, his son, and their crew replaced our front walkway and steps and repaired a foundation wall on our home. They were here on time every morning and cleaned up before they left for the day. The quality of their work is outstanding.
— Kate L., Google review
★★★★★
I couldn't be happier with the work Old Irish Paving did on my driveway! The team was professional, efficient, and the quality of their work is outstanding. They made the whole process stress-free from start to finish.
— Angel G., Google review
FAQ
It depends on size, the condition of the existing surface, how much excavation and base is needed, access and the material. We give free written quotes after a short site visit.
Yes. We pave driveways, patios and walkways for Long Valley homeowners and parking lots and access drives for local businesses.
Yes. We grade, base and compact steep driveways carefully, and add drainage swales, culverts or trench drains so runoff doesn’t wash out the edges.
Spring through late fall, when asphalt plants are open and ground temperatures are above roughly 40–50°F. Book early, because spring and fall fill up quickly.
No. Every 2–3 years is right for most driveways. Sealing too often builds up a film that can crack and peel.
Regrade the driveway so it pitches away from the garage, or install a trench drain across the driveway in front of the door, piped to a dry well or daylight.
Free, no-obligation quote
Tell us about your driveway, patio, steps or masonry project. Tom or a member of the family will call you back promptly to book a free on-site visit and a written quote.
Prefer to talk? (908) 992-2345